1. Choose the country route
ASEAN cooperation does not replace national utility, product, customs, importer or project procedures.

Country-specific review before model selection
JUSTSOLAR supports qualified distributors, installers, agents, EPCs and project buyers with full-container modules, OEM or private label, small modules, solar cells and selected system components. Start with the destination country and five RFQ details.
We have Tier-1 OEM manufacturing experience under NDA. Customer and supplier names are not published, and this experience does not mean JUSTSOLAR is itself listed as a current Tier-1 brand.
Start Southeast Asia RFQThese fields separate a real procurement request from a generic price inquiry.
There is no single Southeast Asia approval path. Keep programme, grid, model evidence, standards, import clearance and commercial supply as separate decisions.
ASEAN cooperation does not replace national utility, product, customs, importer or project procedures.
State distribution stock, rooftop, industrial, off-grid, utility, tender or replacement use.
Review the exact model, certificate holder, legal manufacturer, production site, standard and revision.
Frank or the Director reviews price, payment, delivery, warranty, offer and PI after qualification.
Open the destination guide before requesting a model or document pack. Each page links official authorities and states what still requires buyer, importer, engineer or project review.
ESDM, utility, SNI and import review
Open country guideERC, DOE, DTI-BPS and import review
Open country guideProject route, standards and import review
Open country guideERC, TISI, Customs and project review
Open country guideSolar ATAP, SELCO, SIRIM and Customs review
Open country guideRelated Asia-Pacific procurement guides: Pakistan and Australia.
Model, loading plan and commercial terms follow the written RFQ and current evidence.
For qualified distributors, installers, agents, EPCs and project buyers.
Artwork, model, legal manufacturer, certificate and market scope are reviewed before offer.
Special dimensions and lower-volume applications are reviewed against the specification.
Cell format, grade, quantity, packing and inspection scope must be stated in the RFQ.
Inverters, storage and BOS items are reviewed as supply components, not turnkey project delivery.
Review company evidence, quality and compliance, Import workflow through Official tariff portals, and current product scope before requesting a formal offer.
No. ASEAN provides regional cooperation and trade-information frameworks, but utilities, project routes, product standards, conformity, importer duties, taxes and customs procedures remain country- and application-specific.
No. A regional roadmap or target does not prove a JUSTSOLAR model approval, customer, project award, approved-vendor position, stock level, delivery time or order. Exact evidence is reviewed for the named country and application.
No. The importer should verify the exact classification, description, origin rule, supporting evidence, effective date, tariff measure, tax and destination procedure in the relevant national repository or customs portal.
No. IEC publications define technical requirements or tests. The buyer must still match the exact model, certificate or report holder, manufacturing site, edition, validity and any national, utility, tender or importer requirement.
Provide buyer type, country, product, quantity or MW or containers, and destination port. Frank or the Director then reviews model, documents, price, payment, delivery, warranty, offer and PI terms in writing.
Sources were reviewed on 23 August 2026. They explain the regional framework and why country-specific review is required; they do not prove a JUSTSOLAR approval, customer, project, stock position, price, delivery time or order.
Submit the five details first. Frank or the Director confirms the model, evidence, price, payment, delivery, warranty, offer and PI only after review.
Submit Southeast Asia RFQ