JUSTSOLAR — Solar Module Manufacturer
🇹🇭

Solar Panels for Thailand
BOI + EEC Industrial Ready (2026)

Thailand has ~4 GW solar installed and targets 15 GW by 2037 under AEDP. BOI provides tax holidays + duty waivers for industrial rooftop in EEC. JUSTSOLAR supplies TIS/IEC-compliant TOPCon + HJT — CIF Laem Chabang in 6-10 days. ACFTA Form E = 0% duty.

Thailand Solar Market 2026

Installed (end 2025)
~4 GW
Growing fast under AEDP + PDP
2037 AEDP Target
~15 GW solar
Alternative Energy Development Plan
BOI Incentives
Tax holidays + duty waivers
Industrial rooftop + EEC projects
Avg Yield (kWh/kWp/yr)
1,350-1,500
Central plains + NE highest

Shipping to Thailand

Transit and freight from Shanghai.

Laem Chabang (Chonburi)

Transit: 6-10 days
Freight: $1,300-1,800 per 40'HQ

Principal deepwater port; serves Bangkok + EEC

Bangkok Port (Khlong Toei)

Transit: 6-10 days
Freight: $1,300-1,800 per 40'HQ

Alternative, closer to downtown Bangkok

Map Ta Phut (Rayong)

Transit: 7-11 days
Freight: $1,400-1,900 per 40'HQ

Industrial estate port, petrochemical/steel

Procurement-ready RFQ

Get a complete Thailand import quote, not just a chat reply

Thailand buyers need TISI/utility acceptance, BOI/EEC project context, and ACFTA Form E paperwork before container release. We prepare the buying file an EPC, distributor, or project owner needs before internal approval: landed-cost estimate, technical documents, compliance path, lead time, and container loading.

CIF estimate
Laem Chabang / Bangkok
Compliance pack
TISI/PEA/MEA path + IEC 61215/61730 + Form E
Suggested module
TOPCon 600W/640W for C&I and EEC

Thailand Solar Import FAQ

What certifications are needed for solar panels in Thailand?

IEC 61215 + IEC 61730 required (we provide). TIS (Thai Industrial Standards) 2606 for retail/distributed, aligned with IEC. ERC (Energy Regulatory Commission) registration for grid interconnection. For BOI-promoted industrial rooftop projects: BOI certification + tax incentives application. JUSTSOLAR provides full cert bundle + TIS pathway assistance.

What are BOI incentives for solar in Thailand?

Thailand's Board of Investment (BOI) promotes industrial rooftop solar with: (a) Corporate income tax exemption 3-8 years, (b) Machinery import duty waiver, (c) Accelerated depreciation. Eligible activities include self-consumption rooftop in EEC (Eastern Economic Corridor), industrial estates, and certain SEZ locations. For EPCs + factory owners, BOI application is very valuable — typical 20-30% uplift on project NPV.

What's the import cost structure for Thailand?

Solar modules: 0-5% MFN import duty. ACFTA (ASEAN-China FTA) with Form E reduces to 0%. VAT: 7%. For BOI-promoted projects, machinery duty can be fully waived. Customs clearance at Laem Chabang typically 2-4 days for compliant documentation. JUSTSOLAR provides Form E free for all Thailand shipments.

Can JUSTSOLAR supply under PEA / MEA programs or IPS?

Yes. PEA (Provincial Electricity Authority) and MEA (Metropolitan Electricity Authority) solar rooftop programs accept IEC-compliant modules. For IPS (Independent Power Supply) small utility projects and VSPP (Very Small Power Producer, under 10 MW), JUSTSOLAR qualifies directly. For utility-scale under EGAT tenders: bankability requirements may apply.

What's the C&I rooftop market situation in Thailand?

Very strong. Thailand has large industrial base (auto, electronics, petrochemical) with significant rooftop capacity and rising grid tariffs (TOU rates $0.10-0.15/kWh during peak). Self-consumption rooftop + BOI incentives = 5-7 year payback typical. Major segment: automotive suppliers in EEC (Rayong/Chonburi), electronics in Ayutthaya, food processing across central plains. JUSTSOLAR 600W TOPCon dominant for 500kWp-5MW industrial projects.

What payment terms for Thai buyers?

Payment terms are confirmed in the formal PI. For new Thai buyers and most first orders, JUSTSOLAR uses 100% T/T before shipment. Any exception requires written approval from Frank and will be stated in the PI. USD denominated always (THB not international).

Who are your Thai customers?

We supply C&I EPCs in Bangkok, Rayong (EEC), Ayutthaya industrial corridor. BOI-promoted factory rooftop installations. Distributors servicing installer networks in Chonburi, Samut Prakan, Chiang Mai. Agricultural solar in NE Thailand (Khon Kaen, Nakhon Ratchasima). English-friendly business culture + timezone overlap with China = efficient communication via Frank on WhatsApp.

Thailand Industrial Solar

BOI incentives + fast shipping. WhatsApp the Director for CIF Laem Chabang quote.

WhatsApp the Director
🇹🇭JUSTSOLAR in Thailand

Representative projects in Thailand

We've shipped to Thailand before. Representative projects we can reference.

View full portfolio →
🇹🇭
2023 · Thailand
720 kW
Industrial park rooftop
1,125 × TOPCon 640W
Client type: Industrial park operator
Anonymized

3 more projects in the Southeast Asia region — see the full regional portfolio.

Data sources

Figures and port costs are aggregated from the following open sources plus our internal shipping desk. We update this page each calendar quarter.

  • PVGISSolar irradiation + yield estimates
  • IRENAInstalled capacity + national targets
  • UN ComtradeTrade flows + import volumes
  • BloombergNEFSolar module $/W spot pricing
  • Local customs authorityImport duties + VAT rates
Document v2026.04Last reviewed: 2026-04Methodology & compliance →