1. Choose the country route
A Latin America or MERCOSUR label does not replace national grid, product, customs, importer or project procedures.

Country-specific review before model selection
JUSTSOLAR supports qualified distributors, installers, agents, EPCs and project buyers with full-container modules, OEM or private label, small modules, solar cells and selected system components. Start with the destination country and five RFQ details.
We have Tier-1 OEM manufacturing experience under NDA. Customer and supplier names are not published, and this experience does not mean JUSTSOLAR is itself listed as a current Tier-1 brand.
Start Latin America RFQThese fields separate a real procurement request from a generic price inquiry.
There is no single Latin America approval path. Keep grid, model evidence, standards, import clearance and commercial supply as separate decisions.
A Latin America or MERCOSUR label does not replace national grid, product, customs, importer or project procedures.
State distribution stock, rooftop, industrial, off-grid, utility, tender or replacement use.
Review the exact model, certificate holder, legal manufacturer, production site, standard and revision.
Frank or the Director reviews price, payment, delivery, warranty, offer and PI after qualification.
Each destination requires current authority, importer and project review. Open the country route before requesting a model or document pack.
Model, loading plan and commercial terms follow the written RFQ and current evidence.
For qualified distributors, installers, agents, EPCs and project buyers.
Artwork, model, legal manufacturer, certificate and market scope are reviewed before offer.
Special dimensions and lower-volume applications are reviewed against the specification.
Cell format, grade, quantity, packing and inspection scope must be stated in the RFQ.
Inverters, storage and BOS items are reviewed as supply components, not turnkey project delivery.
Review company evidence, quality and compliance, Import workflow through Official tariff portals, Spanish buyer guide, and Portuguese buyer guide.
Public photos, regional policy and old project figures are not order proof. Review how buyer type, country, product, quantity and destination determine the relevant evidence.
Review project evidence policyNo. Grid connection, product conformity, importer duties, taxes, customs procedures, installer or contractor status and project acceptance depend on the destination country and application.
No. Regional reports provide dated system context. They do not prove a country approval, customer, project award, approved-vendor position, inventory, delivery time, price or order for JUSTSOLAR.
No. The importer should verify the exact product description, destination classification, origin rule, evidence, effective date, trade measure, tariff, quota, tax and national procedure before the import declaration.
No. IEC publications define technical requirements or tests. The buyer must still match the exact model, certificate or report holder, manufacturing site, edition, validity and national, utility, tender or importer requirement.
Provide buyer type, country, product, quantity or MW or containers, and destination port. Frank or the Director then reviews model, documents, price, payment, delivery, warranty, offer and PI terms in writing.
Sources were reviewed on 23 August 2026. They explain regional context and classification frameworks; they do not prove a JUSTSOLAR approval, customer, project, stock position, price, delivery time or order.
Submit the five details first. Frank or the Director confirms the model, evidence, price, payment, delivery, warranty, offer and PI only after review.
Submit Latin America RFQ