Law 1715 + 2099 Tax Ready (2026)

Colombia's solar market grew 40%+ YoY after Law 2099/2021 extended tax incentives (50% income tax deduction + VAT exclusion + import duty exemption). JUSTSOLAR supplies RETIE/CREG-compliant TOPCon + HJT modules with UPME-eligible documentation.

Colombia Solar Market 2026

Installed (end 2025)
~2 GW
Growing 40%+ YoY after Law 2099
2030 Forecast
~8 GW
PEN (National Energy Plan) + auctions
Tax Incentives
50% income tax deduction
Law 1715/2014 + Law 2099/2021
Avg Yield (kWh/kWp/yr)
1,500-1,800
La Guajira + Caribbean coast best

Shipping to Colombia

Transit and freight from Shanghai.

Cartagena (Caribbean)

Transit: 45-50 days
Freight: $4,400-5,100 per 40'HQ

Primary Atlantic port; fastest to Medellín/Bogotá inland

Buenaventura (Pacific)

Transit: 40-46 days
Freight: $4,100-4,700 per 40'HQ

Pacific gateway; serves Cali + Southwest

Barranquilla

Transit: 45-50 days
Freight: $4,400-5,100 per 40'HQ

Caribbean alternative, less congested

Santa Marta

Transit: 45-50 days
Freight: $4,400-5,100 per 40'HQ

Deepwater, coal + general cargo hub

Procurement-ready RFQ

Get a complete Colombia import quote, not just a chat reply

Colombia buyers need RETIE/UPME documentation, Caribbean/Pacific port choice, and tax-incentive support before approving modules. We prepare the buying file an EPC, distributor, or project owner needs before internal approval: landed-cost estimate, technical documents, compliance path, lead time, and container loading.

CIF estimate
Cartagena / Buenaventura / Barranquilla
Compliance pack
RETIE/UPME path + IEC 61215/61730
Suggested module
TOPCon 600W/640W for C&I and utility

Colombia Solar Import FAQ

What certifications are needed for solar panels in Colombia?

IEC 61215 + IEC 61730 required (we provide). RETIE (Reglamento Técnico de Instalaciones Eléctricas) mandatory for all grid-connected electrical equipment — approved by ONAC-accredited lab. CREG (Comisión de Regulación de Energía y Gas) regulation for utility interconnection. For projects seeking Law 1715/2014 or Law 2099/2021 tax benefits: UPME (Unidad de Planeación Minero Energética) pre-registration required. JUSTSOLAR provides full cert bundle + RETIE pathway.

What tax incentives apply for solar in Colombia?

Law 1715/2014 + Law 2099/2021 provide 4 key benefits: (1) 50% income tax deduction of investment over 15 years, (2) Accelerated depreciation 5 years, (3) VAT exclusion on equipment purchase, (4) Import duty exemption on equipment. Combined: ~30-40% IRR boost on most C&I projects. UPME certification required before applying. Our local partners help with documentation.

How long is shipping from Shanghai to Colombia?

Shanghai → Buenaventura (Pacific): 40-46 days via direct Pacific route. Cartagena (Caribbean): 45-50 days via Panama Canal. Add 5-7 days factory production if no stock. Customs clearance at Buenaventura typically 5-10 days (congestion varies). Total order-to-site: 7-8 weeks typical for Cali/Southwest; 8-10 weeks for Bogotá/Medellín (inland transport from Cartagena).

Are there anti-dumping duties on Chinese solar panels in Colombia?

No. Colombia currently has no anti-dumping duties on Chinese solar modules. Standard MFN import duty ~5% (often waived under Law 1715/2021 for certified projects). VAT 19% (also waived for certified solar projects). For certified projects, effective tax is near-zero. For non-certified retail: standard duties apply.

Is Colombia good for utility-scale or C&I?

Both are growing. Utility-scale: La Guajira wind + solar complex (1+ GW planned), Caribbean coast + Córdoba auctions. C&I: industrial rooftop (Medellín textile + Bogotá beverage/food + Cali sugar industry) accelerating due to high peak tariffs. Distributed generation under 5MW uses simpler CREG framework. JUSTSOLAR supplies all segments.

What payment terms for Colombian buyers?

Payment terms are confirmed in the formal PI. For new Colombian buyers and most first orders, JUSTSOLAR uses 100% T/T before shipment. Any exception requires written approval from Frank and will be stated in the PI. USD denominated always (COP not international).

Who are your Colombian customers?

We supply C&I EPCs in Bogotá, Medellín, Cali. Industrial rooftop in Barranquilla free zone, Cartagena port industrial. Utility-scale developers in La Guajira + Córdoba + Atlántico. Spanish support via Frank — see also our Spanish wholesale pricing + vs LONGi comparison.

Colombia Solar Boom — Tax Incentive Era

RETIE ready, UPME-eligible. WhatsApp the Director for CIF Buenaventura or Cartagena.

WhatsApp the Director
🇨🇴JUSTSOLAR in Colombia

Representative projects in Colombia

We've shipped to Colombia before. Representative projects we can reference.

View full portfolio →
🇨🇴
2024 · Colombia
700 kW
Commercial + Law 2099 tax credit
1,167 × TOPCon 600W
Client type: Retail distribution
Anonymized

4 more projects in the Latin America region — see the full regional portfolio.

Data sources

Figures and port costs are aggregated from the following open sources plus our internal shipping desk. We update this page each calendar quarter.

  • PVGISSolar irradiation + yield estimates
  • IRENAInstalled capacity + national targets
  • UN ComtradeTrade flows + import volumes
  • BloombergNEFSolar module $/W spot pricing
  • Local customs authorityImport duties + VAT rates
Document v2026.04Last reviewed: 2026-04Methodology & compliance →